Tag: Post-Turnover Operational Watch (90-day / 12-month)
-
Case Study 2: Post-Turnover Operational Watch
Infant mortality, seasonal transition, and tuning drift in the first 12 months, and the watch that catches drift before it becomes an outage.
-
Case Study 5: The Cascading Loss of Cooling: Incident Response and Recovery
A spring-to-summer cascade to complete loss of cooling: one pump kept running, a minute or two of grace, and hours to restore the chillers.
